airavata-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Suresh Marru (JIRA)" <j...@apache.org>
Subject [jira] [Updated] (AIRAVATA-1436) Provide meta scheduling capabilities within Airavata
Date Thu, 09 Apr 2015 18:54:13 GMT

     [ https://issues.apache.org/jira/browse/AIRAVATA-1436?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Suresh Marru updated AIRAVATA-1436:
-----------------------------------
    Fix Version/s: WISHLIST

> Provide meta scheduling capabilities within Airavata
> ----------------------------------------------------
>
>                 Key: AIRAVATA-1436
>                 URL: https://issues.apache.org/jira/browse/AIRAVATA-1436
>             Project: Airavata
>          Issue Type: Epic
>          Components: Airavata Orchestrator, GFac
>            Reporter: Suresh Marru
>             Fix For: WISHLIST
>
>
> As discussed on the architecture mailing list [1] and summarized at [2], Airavata will
need to develop a metascheduler. In the short term, a user request (demeler, gobert) is to
have airavata throttle jobs to resources. In the future more informed scheduling strategies
needs to be integrated. Hopefully, the actual scheduling algorithms can be borrowed from third
party implementations. 
> [1] - http://markmail.org/message/tdae5y3togyq4duv
> [2] - https://cwiki.apache.org/confluence/display/AIRAVATA/Airavata+Metascheduler



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message