hadoop-mapreduce-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Allen Wittenauer (JIRA)" <j...@apache.org>
Subject [jira] [Resolved] (MAPREDUCE-224) limit running tasks per job
Date Thu, 17 Jul 2014 19:39:05 GMT

     [ https://issues.apache.org/jira/browse/MAPREDUCE-224?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Allen Wittenauer resolved MAPREDUCE-224.
----------------------------------------

    Resolution: Duplicate

I'm going to close this out as a duplicate of MAPREDEUCE-5583.

> limit running tasks per job
> ---------------------------
>
>                 Key: MAPREDUCE-224
>                 URL: https://issues.apache.org/jira/browse/MAPREDUCE-224
>             Project: Hadoop Map/Reduce
>          Issue Type: New Feature
>            Reporter: Doug Cutting
>
> It should be possible to specify a limit to the number of tasks per job permitted to
run simultaneously.  If, for example, you have a cluster of 50 nodes, with 100 map task slots
and 100 reduce task slots, and the configured limit is 25 simultaneous tasks/job, then four
or more jobs will be able to run at a time.  This will permit short jobs to pass longer-running
jobs.  This also avoids some problems we've seen with HOD, where nodes are underutilized in
their tail, and it should permit improved input locality.



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Mime
View raw message