ASF GitHub Bot commented on HELIX-601:
--------------------------------------
Github user kanakb commented on the pull request:
https://github.com/apache/helix/pull/30#issuecomment-113998619
This feels like a hack. If A depends on B, then A should never run before B. If it is
acceptable for A and B to run in parallel, then A should not depend on B.
> Allow work flow to schedule dependency jobs in parallel
> -------------------------------------------------------
>
> Key: HELIX-601
> URL: https://issues.apache.org/jira/browse/HELIX-601
> Project: Apache Helix
> Issue Type: New Feature
> Reporter: Congrui Ji
>
> Currently, Helix won't schedule dependency jobs in a same work flow. For example, if
Job2 depends on Job1, Job2 won't be scheduled until every partition of Job1 is completed.
> However, if some participant is very slow, then all dependency jobs is waiting for that
single participant.
> Helix should be able to schedule multiple jobs according to a parameter.
> A.C.
> 1. Introduce parallel count parameter in work flow and job queue.
> 2. Dependency jobs can be scheduled according to the parameter (Now the parameter is
always 1, so no parallel)
> 3. If Job2 depends on Job1, Job1 is scheduled before Job2.
> 4. No parallel jobs on the same instance. If a instance is running Job1, it won't run
Job2 until Job1 is finished.
--