hive-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hive QA (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (HIVE-19829) Incremental replication load should create tasks in execution phase rather than semantic phase
Date Sun, 17 Jun 2018 16:53:00 GMT

    [ https://issues.apache.org/jira/browse/HIVE-19829?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16515135#comment-16515135
] 

Hive QA commented on HIVE-19829:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12927968/HIVE-19829.06.patch

{color:green}SUCCESS:{color} +1 due to 4 test(s) being added or modified.

{color:green}SUCCESS:{color} +1 due to 14541 tests passed

Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/11858/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/11858/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-11858/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12927968 - PreCommit-HIVE-Build

> Incremental replication load should create tasks in execution phase rather than semantic
phase
> ----------------------------------------------------------------------------------------------
>
>                 Key: HIVE-19829
>                 URL: https://issues.apache.org/jira/browse/HIVE-19829
>             Project: Hive
>          Issue Type: Task
>          Components: repl
>    Affects Versions: 3.1.0, 4.0.0
>            Reporter: mahesh kumar behera
>            Assignee: mahesh kumar behera
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 3.1.0, 4.0.0
>
>         Attachments: HIVE-19829.01.patch, HIVE-19829.02.patch, HIVE-19829.03.patch, HIVE-19829.04.patch,
HIVE-19829.06.patch
>
>
> Split the incremental load into multiple iterations. In each iteration create number
of tasks equal to the configured value.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Mime
View raw message