hive-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hive QA (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (HIVE-19829) Incremental replication load should create tasks in execution phase rather than semantic phase
Date Fri, 27 Jul 2018 14:26:00 GMT

    [ https://issues.apache.org/jira/browse/HIVE-19829?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16559836#comment-16559836
] 

Hive QA commented on HIVE-19829:
--------------------------------

| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:red}-1{color} | {color:red} patch {color} | {color:red}  0m 10s{color} | {color:red}
/data/hiveptest/logs/PreCommit-HIVE-Build-12899/patches/PreCommit-HIVE-Build-12899.patch does
not apply to master. Rebase required? Wrong Branch? See http://cwiki.apache.org/confluence/display/Hive/HowToContribute
for help. {color} |
\\
\\
|| Subsystem || Report/Notes ||
| Console output | http://104.198.109.242/logs//PreCommit-HIVE-Build-12899/yetus.txt |
| Powered by | Apache Yetus    http://yetus.apache.org |


This message was automatically generated.



> Incremental replication load should create tasks in execution phase rather than semantic
phase
> ----------------------------------------------------------------------------------------------
>
>                 Key: HIVE-19829
>                 URL: https://issues.apache.org/jira/browse/HIVE-19829
>             Project: Hive
>          Issue Type: Task
>          Components: repl
>    Affects Versions: 3.1.0, 4.0.0
>            Reporter: mahesh kumar behera
>            Assignee: mahesh kumar behera
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 4.0.0
>
>         Attachments: HIVE-19829.01.patch, HIVE-19829.02.patch, HIVE-19829.03.patch, HIVE-19829.04.patch,
HIVE-19829.06.patch, HIVE-19829.07.patch, HIVE-19829.07.patch, HIVE-19829.08-branch-3.patch,
HIVE-19829.08.patch, HIVE-19829.09.patch, HIVE-19829.10-branch-3.patch, HIVE-19829.10.patch,
HIVE-19829.11-branch-3.patch, HIVE-19829.12-branch-3.patch, HIVE-19829.13-branch-3.patch
>
>
> Split the incremental load into multiple iterations. In each iteration create number
of tasks equal to the configured value.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Mime
View raw message