From Steve Vinoski <vino...@iona.com>
Subject Re: Release and Maven
Date Fri, 10 Nov 2006 18:52:48 GMT
On Nov 10, 2006, at 1:45 PM, Carl Trieloff wrote:

>
> I have IRC'ed, water cooler chatted with a few of the
> committers. From that I would like  to suggest the following:
>
> 1. We create a LABEL of what we have now. Rajith
> has done this for us ( If all goes wrong we can go back)
> 2. One of the biggest issues that Steve has been having is
> tests, to this end it would be easier for Steve to restructure
> tests on trunk. I suggest that he do this today. This means that
> he has less back merging to do.
>
> Then, as we will still have builds on the trunk we have two options:
> a.) If Maven branch is clean by Monday and can create RC's we do
> a quick vote monday to include maven and merge to trunk based on
> the state of the branch.
> b.) If Maven branch is not at this point, we create a branch for  
> the RC
> from trunk and create the M1 RC without maven. Once we have this
> branch for M1, we get the maven merged on trunk not affecting M1
>
> I expect that we will have most of the other issues compete Monday,
> and either way we have a RC Tuesday that we can test / refine with
> or without maven, and have made a clear way for Steve to get his
> branch merged back. Either Monday or post branch Wednesday.
>
> Does this fly...

+1. This definitely works for me. Only issue for me is the window, as  
I'm not entirely sure I'll be able to restructure the tests today  
only, but if by "today" you mean "Friday and Saturday" then I think I  
can do it. ;-)

--steve