sqoop-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Colin Ma (JIRA)" <j...@apache.org>
Subject [jira] [Updated] (SQOOP-2656) Sqoop2: NPE will happen in connector-loading-tests when do the slow integration test
Date Wed, 04 Nov 2015 03:42:27 GMT

     [ https://issues.apache.org/jira/browse/SQOOP-2656?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Colin Ma updated SQOOP-2656:
----------------------------
    Attachment: SQOOP-2656.001.patch

This a minor change without review board.

> Sqoop2: NPE will happen in connector-loading-tests when do the slow integration test
> ------------------------------------------------------------------------------------
>
>                 Key: SQOOP-2656
>                 URL: https://issues.apache.org/jira/browse/SQOOP-2656
>             Project: Sqoop
>          Issue Type: Bug
>            Reporter: Colin Ma
>            Assignee: Colin Ma
>             Fix For: 1.99.7
>
>         Attachments: SQOOP-2656.001.patch
>
>
> NPE will happen in connector-loading-tests when do the slow integration test



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message