flink-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "vinoyang (JIRA)" <j...@apache.org>
Subject [jira] [Assigned] (FLINK-10506) Introduce minimum, target and maximum parallelism to JobGraph
Date Mon, 04 Mar 2019 01:08:00 GMT

     [ https://issues.apache.org/jira/browse/FLINK-10506?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

vinoyang reassigned FLINK-10506:
--------------------------------

    Assignee: vinoyang

> Introduce minimum, target and maximum parallelism to JobGraph
> -------------------------------------------------------------
>
>                 Key: FLINK-10506
>                 URL: https://issues.apache.org/jira/browse/FLINK-10506
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Runtime / Coordination
>    Affects Versions: 1.7.0
>            Reporter: Till Rohrmann
>            Assignee: vinoyang
>            Priority: Major
>             Fix For: 1.8.0
>
>
> In order to run a job with a variable parallelism, one needs to be able to define the
minimum and maximum parallelism for an operator as well as the current target value. In the
first implementation, minimum could be 1 and maximum the max parallelism of the operator if
no explicit parallelism has been specified for an operator. If a parallelism p has been specified
(via setParallelism(p)), then minimum = maximum = p. The target value could be the command
line parameter -p or the default parallelism.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Mime
View raw message