flink-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "ASF GitHub Bot (Jira)" <j...@apache.org>
Subject [jira] [Updated] (FLINK-14449) SavepointMigrationTestBase deadline should be setup in the test
Date Fri, 18 Oct 2019 12:11:00 GMT

     [ https://issues.apache.org/jira/browse/FLINK-14449?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

ASF GitHub Bot updated FLINK-14449:
-----------------------------------
    Labels: pull-request-available  (was: )

> SavepointMigrationTestBase deadline should be setup in the test
> ---------------------------------------------------------------
>
>                 Key: FLINK-14449
>                 URL: https://issues.apache.org/jira/browse/FLINK-14449
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Tests
>    Affects Versions: 1.8.0
>            Reporter: Chesnay Schepler
>            Assignee: Chesnay Schepler
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 1.10.0
>
>
> The {{SavepointMigrationTestBase}} contains a {{static final Deadline}} that is used
in all tests. In practice this means that the deadline is quite unreliable, since it is setup
when the class is instantiated, opposed to any tests being run.
> If fork-reuse is enabled the tests consistently fail with a timeout for this reason.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Mime
View raw message